首页 > SAP > FIORI > Allocate Production
2019
08-28

Allocate Production


此APP实施相关信息:
模块:Upstream
GUI事务码:
功能描述:Allocate Production
OData服务:UPS_HCA_STATUS
UI5激活SAP应用:/sap/bc/ui5_ui5/sap/ups_alloc_stat
权限角色::SAP_UPS_ALLOC_STAT_APP


此APP对SAP支持如下:
模块:Hydrocarbon Accountant;
版本:SAP ERP, min. EHP 7
Required Back-End Product:Supply Chain
APP类型:Transactional(SAP Fiori (SAPUI5))
数据库支持类型:Any DB


此APP对BSP支持如下:
BSP名称:UPS_ALLOC_STAT
BSP包:OIL_UPSTREAM_HCA
BSP组件及版本:UIEAAP01 100
BSP运用地址:/sap/bc/ui5_ui5/sap/ups_alloc_stat

APP使用行业:
Oil and Gas

View the status of the selected networks.Run allocation for Ready to be Allocated networks.View the results for networks that have already run allocation.Navigate to the relevant screens to fix errors.Navigate back automatically to the Network Allocation Status screen with the updated list once an error is fixed.Navigate back automatically to the Network Allocation Status screen with the updated list (with the new network status), either when an allocation is run or an approval is gained.

摘要:With the transactional app Allocate Production you, in your role as Hydrocarbon Analyst, can have an overview of the allocation status of the production networks (made from the selection filters). The statuses can be Ready to be Allocated, Errors (with details of errors), or the Allocation Run Status depending on the approvals gained. You can view the Allocation Results for all the Production Networks that have already run allocation and also to run approvals, if required. The user can navigate to the Fix Error screen, when Production Network has errors. This app also allows you to view the selected allocated networks in the Reporting Center.View the status of the selected networks.Run allocation for Ready to be Allocated networks.View the results for networks that have already run allocation.Navigate to the relevant screens to fix errors.Navigate back automatically to the Network Allocation Status screen with the updated list once an error is fixed.Navigate back automatically to the Network Allocation Status screen with the updated list (with the new network status), either when an allocation is run or an approval is gained.

最后编辑:
作者:yangsen
本站为个人博客网站,全由我个人维护,我从事SAP开发13年,其它ERP开发7年,基本都是零售行业。本站记录工作学习的过程, 有SAP相关询问专、兼职工作可随时联系我。 有网站相关的问题可直接在文章下方留言,或者联系我。 邮件:yan252@163.com给我。 QQ:415402519

留下一个回复

你的email不会被公开。