首页 > SAP > FIORI > WBS-Element Exceeding Work
2019
08-28

WBS-Element Exceeding Work


此APP实施相关信息:
模块:PS
GUI事务码:
功能描述:WBS-Element Exceeding Work
OData服务:
UI5激活SAP应用:/sap/bc/ui5_ui5/sap/ps_wbswork_excd
权限角色::


此APP对SAP支持如下:
模块:Project Logistics Controller;
版本:SAP ERP
Required Back-End Product:R&D/Engineering
APP类型:Analytical(SAP Smart Business Tile & Custom Drill Down App)
数据库支持类型:HANA DB or HANA side-by-side


此APP对BSP支持如下:
BSP名称:PS_WBSWORK_EXCD
BSP包:I2D_PS_PROJECT_EXECUTION
BSP组件及版本:UISERP01 100
BSP运用地址:/sap/bc/ui5_ui5/sap/ps_wbswork_excd

APP使用行业:
Aerospace and Defense,Automotive,Chemicals,Consumer Products,Cross Industry,Engineering, Construction and Operations,High Tech,Higher Education and Research,Industrial Machinery and Components,Life Sciences,Media,Mill Products,Mining,Oil and Gas,Retail,Sports and Entertainment,Telecommunications,Travel and Transportation,Utilities

Enables you to drill-down to the specific details of a WBS element.Displays the partial project hierarchy structure from the selected WBS element up to the project definition. Enables you to view charts that display the following: View activities by WBS elements: This chart is used to display the activities for which the forecasted work has exceeded the planned work.View overall work in hours: This chart displays the number of activities with overall actual and planned work, remaining work, and exceeded planned work. Remaining work corresponds to the difference between the forecasted work and actual work.You can group the WBS elements based on the project it belongs to or the exceeded percentage range. You can filter the WBS elements based on any of the following options: Project IDWBS ElementHierarchy LevelExceeded PercentageYou can navigate to related transactional apps and fact sheetsThe app is integrated with the SAP Jam collaboration platform.

摘要:The analytical app displays the Key Performance Indicator (KPI) WBS Element Exceeding Work. You can view the actual, planned, remaining and exceeding work for activities in a work breakdown structure (WBS) element.Enables you to drill-down to the specific details of a WBS element.Displays the partial project hierarchy structure from the selected WBS element up to the project definition. Enables you to view charts that display the following: View activities by WBS elements: This chart is used to display the activities for which the forecasted work has exceeded the planned work.View overall work in hours: This chart displays the number of activities with overall actual and planned work, remaining work, and exceeded planned work. Remaining work corresponds to the difference between the forecasted work and actual work.You can group the WBS elements based on the project it belongs to or the exceeded percentage range. You can filter the WBS elements based on any of the following options: Project IDWBS ElementHierarchy LevelExceeded PercentageYou can navigate to related transactional apps and fact sheetsThe app is integrated with the SAP Jam collaboration platform.Extension point for new actions,Extension point for info tab content,Extension point for facet filter options,Extension point for additional tabs,

最后编辑:
作者:yangsen
本站为个人博客网站,全由我个人维护,我从事SAP开发13年,其它ERP开发7年,基本都是零售行业。本站记录工作学习的过程, 有SAP相关询问专、兼职工作可随时联系我。 有网站相关的问题可直接在文章下方留言,或者联系我。 邮件:yan252@163.com给我。 QQ:415402519