WBS Element Cost Variance


此APP实施相关信息:
模块:PS
GUI事务码:
功能描述:WBS Element Cost Variance
OData服务:
UI5激活SAP应用:/sap/bc/ui5_ui5/sap/ps_wbscost_varc
权限角色::


此APP对SAP支持如下:
模块:Project Financial Controller;
版本:SAP ERP
Required Back-End Product:R&D/Engineering
APP类型:Analytical(SAP Smart Business Tile & Custom Drill Down App)
数据库支持类型:HANA DB or HANA side-by-side


此APP对BSP支持如下:
BSP名称:PS_WBSCOST_VARC
BSP包:I2D_PS_PROJECT_EXECUTION
BSP组件及版本:UISERP01 100
BSP运用地址:/sap/bc/ui5_ui5/sap/ps_wbscost_varc

APP使用行业:
Aerospace and Defense,Automotive,Chemicals,Consumer Products,Cross Industry,Engineering, Construction and Operations,High Tech,Higher Education and Research,Industrial Machinery and Components,Life Sciences,Media,Mill Products,Mining,Oil and Gas,Retail,Sports and Entertainment,Telecommunications,Travel and Transportation,Utilities

Enables you to drill-down to the specific details of a WBS element.Displays the partial project hierarchy structure from the selected WBS element up to the project definition. Enables you to view charts that display the deviation between the actual (including commitment costs) and planned costs. The planned and actual (including commitment) cost is determined as on the current date based on the CO version provided. For every fiscal year, only (01-12) periods are used for calculating the corresponding revenue until the current date. You can view individual cost items through the line chart display. You can additionally sort the line items based on controlling area value, posting date or cost element. For the line charts, the cumulated costs are displayed for the current and previous fiscal year.You can group the WBS elements based on the project it belongs to or the percentage of cost exceeded. You can filter the WBS elements based on any of the following options: Exceeded percentage of costProjectWBS ElementYou can navigate to related transactional apps and fact sheets.Integration with the SAP Jam collaboration platform.In this list, you can also name important navigation target (other apps, not screens).

摘要:The analytical app displays the Key Performance Indicator (KPI) WBS Element Cost Variance. The cost variance is displayed when the total actual costs exceeds the total planned costs of a WBS element. You can also check the percentage of the total planned cost that is consumed by the WBS element.Enables you to drill-down to the specific details of a WBS element.Displays the partial project hierarchy structure from the selected WBS element up to the project definition. Enables you to view charts that display the deviation between the actual (including commitment costs) and planned costs. The planned and actual (including commitment) cost is determined as on the current date based on the CO version provided. For every fiscal year, only (01-12) periods are used for calculating the corresponding revenue until the current date. You can view individual cost items through the line chart display. You can additionally sort the line items based on controlling area value, posting date or cost element. For the line charts, the cumulated costs are displayed for the current and previous fiscal year.You can group the WBS elements based on the project it belongs to or the percentage of cost exceeded. You can filter the WBS elements based on any of the following options: Exceeded percentage of costProjectWBS ElementYou can navigate to related transactional apps and fact sheets.Integration with the SAP Jam collaboration platform.In this list, you can also name important navigation target (other apps, not screens).Allows you add action items to the Actions menu,Allows you add action items in the drill-down Actions menu,Allows you to add fields under the info tab,Allows you to add options to the facet filter in the master list.,Allows you to create additional tab filters,