Schedule MRP Runs(MD01N, MD02, MD03, MD40, MD41, MD42, MD43, MPBT, MSBT)


此APP实施相关信息:
模块:PP
GUI事务码:MD01N, MD02, MD03, MD40, MD41, MD42, MD43, MPBT, MSBT
功能描述:Schedule MRP Runs
OData服务:APJ_JOB_MANAGEMENT_SRV
UI5激活SAP应用:/sap/bc/ui5_ui5/sap/nw_aps_apj
权限角色::


此APP对SAP支持如下:
模块:Material Planner;
版本:SAP S/4HANA
Required Back-End Product:Manufacturing
APP类型:Transactional(Generic UI5 Job Scheduling Framework)
数据库支持类型:HANA DB exclusive


此APP对BSP支持如下:
BSP名称:NW_APS_APJ
BSP包:RS_BASIS_APS_UX_APJ
BSP组件及版本:UIS4HOP1 200
BSP运用地址:/sap/bc/ui5_ui5/sap/nw_aps_apj

APP使用行业:
Aerospace and Defense,Automotive,Chemicals,Consumer Products,Cross Industry,Engineering, Construction and Operations,Higher Education and Research,Life Sciences,Mill Products,Mining,Oil and Gas,Sports and Entertainment,Utilities

摘要:With this app you can create and schedule a job for executing your MRP runs. To automate the planning process, the MRP run is carried out on a regular basis so you can use this app to create a job that performs this task for you; reducing your workload by running this task smoothly in the background. During the MRP run, the system checks whether current material demand can be covered by current inventory and expected material receipts. In regenerative planning, the system plans all materials irrespective of whether they have been changed since the last MRP run. In net change planning, the system only plans materials that have changed since the last planning run. If current demand is not covered, the system creates purchase requisitions.